Ten Years in the Field: Scaretech Marks a Decade of Offshore Innovation

| Terry Christie

Scaretech marks ten years of offshore innovation

Ten years ago, Scaretech deployed its first offshore bird deterrent device to Race Bank - an offshore wind farm off the North Norfolk coast that would go on to become one of the UK's most significant renewable energy projects.

It was a quiet milestone at the time. A mechanical device. A North Sea installation. A problem solved.

But looking back, it marked the start of something much bigger.

Where It Began

Race Bank was still under construction when the Scaretech device first went to work. The wind farm - developed by Dong Energy, and later handed over to Ørsted and eventually comprising 91 Siemens Gamesa turbines with a combined capacity of 573MW - was one of the most complex offshore builds of its generation. Challenging seabed conditions, an intricate export cable route, and a project that pushed UK offshore engineering to new limits.

That's the kind of environment Scaretech was designed for.

Founded by Terry Christie, who brings decades of hands-on experience across offshore oil, gas, marine and renewables sectors, Scaretech was built on a straightforward principle: identify a real problem in offshore environments and engineer a solution that actually works at sea.

The bird deterrent device - sensor-triggered, available in mains and solar-powered configurations - does exactly that. It protects offshore infrastructure from bird-related damage and fouling without the use of chemicals or harm to wildlife. It's built to survive the conditions that would destroy most equipment. And it's been doing its job, offshore, for a decade on various wind farms, most notably Race Bank, Burbo Bank and Galloper Windfarm where senior management has reported a 85-95% reduction in guano.

What Ten Years Looks Like

In the time since that first Race Bank deployment, the offshore renewables sector has transformed beyond recognition. The UK has gone from ambition to world leadership in offshore wind. Capacity has multiplied. New technologies have come online. The workforce has scaled dramatically.

Scaretech has scaled with it.

The Devices division - that original product - remains active, deployed and maintained under a lease model that keeps Scaretech engineers close to the hardware and the environments it operates in. That operational knowledge doesn't sit on a shelf. It feeds directly into everything the business does.

The Services division, led by Allan and built on years of rope access, inspections and specialist offshore operational work, extends that reach further. Where the device goes, the expertise follows. We also offer pest control for ports and industrial sites.

And now, as Scaretech moves into its next chapter on the River Tyne, the Academy is taking shape - an offshore training facility designed to address one of the sector's most pressing challenges: a skilled workforce that can keep pace with the energy transition.

What Comes Next

The Scaretech Academy is set to open in September 2026 from the company's new base on the Tyne - two riverside units, private jetty access, and a facility purpose-built for offshore skills development. Training pools, working-at-heights infrastructure, replica offshore environments. The kind of facility the North East has been missing.

Everything Scaretech has learned in ten years of offshore operations - the conditions, the standards, the practical demands of real-world deployments - feeds directly into how the Academy will train the next generation of offshore workers.

Race Bank was the start of the story. This is the next chapter.

Scaretech is a North East-based offshore technology and training company. For information about the Academy, Devices or Services divisions, get in touch via the contact page.


Get Your Next Project Done!