Explore the blueprint of

THE SCARETECH VISION

An interactive look at the 3D models, facility layouts, and strategic plans.

EXPLORE THE VISION

Introduction

Where It All Began

2016

Scaretech began with a real offshore problem. Bird fouling on offshore structures damages equipment, creates serious hygiene hazards and drives relentless maintenance costs - and nothing on the market was built to deal with it in a genuine offshore environment.

Terry Christie, after decades working offshore across oil, gas, marine and renewables, designed a mechanical deterrent to solve it. Over the ten years that followed, the device was trialled across offshore wind farms, substations and rigs - returning effectiveness results above 95% - and the story went right across the international trade press, from Windpower Monthly to Energy Voice to Rigzone, with a Vice News film crew coming out along the way. Three ISO certifications and a second-generation device followed.

By the end of the decade the technology was proven, patented, certified and deployed with major operators. What it didn't yet have was a base, a team and a plan to match it.

The Scaretech device

Loading the device

The Scaretech device

Transportation

The Scaretech device deployed offshore

Deployed

2016

Scaretech device on a boat heading offshore
Device designed

The first Scaretech deterrent is designed and built to solve bird fouling on offshore assets.

First offshore deployment

The device goes offshore for the first time - the start of a decade of live operation. [TBC-first-deployment-year]

First trade press wave - May 2017

Featured on Offshore Wind · Windpower Monthly

VICE News on HBO - Scaretech feature Featured on VICE News on HBO
ISO Certification & Mark 2

First of three ISO certifications secured, alongside the second-generation device - refined from years of live offshore feedback. [TBC-iso-1-year] [TBC-mark-2-year]

Global coverage - August 2020

Featured on Energy Voice · OE Digital · Ocean News · Rigzone · Business Live · GlobalSpec

This Year So Far

2026

This year, everything changed. Terry bought out his original partners and took full ownership of Scaretech - and with it, full control of where it goes next.

Home became Morston Quay in Wallsend: Unit A4, directly on the River Tyne, with private jetty frontage. And for the first time, the full team came together - engineering and technical training, an IRATA-led rope access and services crew, and dedicated marketing and technology.

The work followed fast. Four devices installed for a global power company. Then a complete delivery for a global subsea cable manufacturer: two devices re-engineered from solar to mains power for an indoor environment nobody had planned for, high-level netting installed by the rope access team, and a full guano decontamination - a real problem, an unforeseen constraint, an engineering answer, delivered.

Alongside the operational work, the brand was rebuilt from the ground up - a new website, an active LinkedIn and Facebook presence, and an audience in the tens of thousands.

The cable warehouse delivery

2026

Morston Quay

Unit A4 secured - riverside, private jetty frontage, room for all three divisions.

The team assembles

Engineering, rope access and services, marketing and technology - the full team in place for the first time.

Four-device installation

Four Scaretech devices installed for a global power company.

The cable warehouse job

Devices adapted, netting installed, full decontamination - delivered end to end for a global subsea cable manufacturer.

The brand rebuilt

New website, LinkedIn and Facebook presence - reaching tens of thousands.

What Comes Next

Ongoing

Unit A4 is occupied and working. Scaffolding is up for resurfacing, repainting and new signage. Inside, the internal design is substantially complete - a dimensionally accurate 3D model, built from physical measurements against GWO, IRATA, OPITO and STCW course standards, covering the container training tower, the sea survival pool, the classroom wing and the mezzanine offices - with fabrication engagement the next step.

The sequence from here is deliberate: fit-out, apparatus, accreditation, delegates - building toward a combined GWO, IRATA, OPITO and STCW offering that no other site in the region carries. And beyond Unit A4, Unit A3 - the larger neighbouring unit, currently at heads of terms stage - carries the manufacturing line, the helideck training area and the expanded course suite.

This is what the rest of this document lays out - the facility, the Academy, the opportunity, and how it all fits together.

Unit A4 - the model in motion

NEARFUTURE

Fit-out and fabrication

Unit A4 internal design substantially complete - fabrication engagement is the next step.

Apparatus installation

Container tower, sea survival pool, fire training ground, classrooms.

GWO accreditation

Facility audit and instructor qualification for the core GWO suite.

First delegates

BST delivery begins - the Academy opens its doors.

Expanding the suite

ART, EFA and the IRATA, OPITO and STCW pathways beyond.

Unit A3

The second unit - manufacturing, OHLO, rescue boat and expanded delivery.