The Facility

The Site

Morston Quay, Stephenson Street, Wallsend, Tyne and Wear, NE28 6UE

Morston Quay sits within the River Tyne Economic Corridor, one of the North East's designated investment zones. Scaretech operates from Unit A4 - a riverside industrial unit with private jetty frontage - with the larger neighbouring Unit A3 at heads of terms stage, carrying the expansion scope.

The river frontage isn't a scenic backdrop. Devices load straight onto vessels from the site itself, open-water training runs from the quayside, and the working environment trainees certify in is the same one the industry operates in.

Every space on this site is placed and sized against a specific course requirement - the facility design and the training standards were developed together, not bolted onto each other afterwards.

The site - Units A4 and A3, from the model

The site today

Unit A4 - The Working Base

Unit A4 is occupied and operational - offices, storage and the Services division working from it today, with scaffolding up for resurfacing, repainting and new signage.

Inside, the fit-out design is substantially complete: a dimensionally accurate 3D model built from physical measurements against GWO course standards, with a 9.61m clear height at the north end and every training zone positioned deliberately - the container tower against the structural grid, the pool with its changing rooms, the two-storey classroom wing, and the mezzanine office block. Fabrication engagement is the next step.

Staged fit-out reveal - shell to full training floor

Unit A4 exterior

The Apparatus

Four core training environments, each built to the governing standard it serves. Select any course in The Academy to see exactly which apparatus delivers it.

The Container Tower

Two stacked containers with a freestanding scaffold tower - an intermediate platform at 2.59m, a top working deck at 7.3m, a full-height fall arrest ladder, a 1.5m hub chamber and a 3m blade root confined-space passage. One structure delivering GWO Working at Height, both Advanced Rescue modules, and the practical foundation for IRATA rope access.

The container tower - with dimension callouts

The Sea Survival Pool

Sized for life raft deployment and immersion suit swimming, with a jump entry platform, a WTG boat landing ladder and changing rooms adjacent. Built for GWO Sea Survival - including the new Walk-to-Work transfer lesson - and specified with helicopter underwater escape delivery in mind from the outset.

The sea survival pool

The Fire Training Ground

A dedicated external fire area for live extinguisher and breathing apparatus training - serving GWO Fire Awareness and the firefighting elements of the OPITO and STCW pathways.

Fire training ground - site planning in progress

Classrooms & Offices

A two-storey classroom wing with ground and first floor teaching rooms for groups of 8-12, a kitchen and dining area, toilets and a viewing area overlooking the training floor - alongside a mezzanine office block housing the operational team.

The classroom wing

The mezzanine offices

Unit A3 - The Expansion

Unit A3 is the larger neighbouring unit, currently at heads of terms stage. It carries the scope Unit A4's footprint can't: the device manufacturing and refurbishment line, the helideck training area for helicopter landing officer courses, dedicated environments for advanced first aid and rescue boat training, equipment storage and preparation for the Services division, and full riverside integration for open-water work.

The two units together make Scaretech a full-scope provider from a single riverside site - technology, services and training, side by side.

Future scope

Unit A3 - structural model

The Jetty

Private jetty frontage directly onto the River Tyne. Device loadout without trucking to a port, quayside access for rescue boat and open-water training, and a working river environment metres from the classroom door.

Jetty integration is in design - the structural survey and build-out plan sit within the Unit A3 phase. Plans include a substation simulator, a replica ship's stern, a helipad and a small wind turbine, bringing genuine offshore and maritime apparatus right to the water's edge.

The jetty - planned apparatus